Washing Machine Point in Islamabad
4.8
12k+ Bookings Our ProcessInspection: Assessing the optimal location and plumbing requirements for your new washing machine inlet and drain points. Execution: Installing the new water inlet and drain lines, ensuring proper connections and leak-free operation. Cleanup: Thoroughly cleaning the work area, leaving it tidy and ready for use. Warranty Activation: The service is covered by a 30-day warranty strictly on workmanship/installation quality. Washing Machine PointThis service covers the professional creation of water connection points.* Tapping into the main water line.* Installing a specialized machine tap/valve.* Setting up the drainage pipe connection.* Leakage testing with the machine running.* Clean-up of the work area after completion.
Starting from
Rs. 1000
Book Now Rs. 1000
100% Money Back Guarantee
If you are not satisfied with the service
Pricing & Add-Ons
Standard
Rs. 1000
Frequently Asked Questions
How long does it typically take to install a new washing machine point?
The installation usually takes 2-4 hours, depending on the complexity of routing the new water and drain lines to your desired location.
What preparations do I need to make before the plumber arrives?
Please ensure the intended installation area is clear of obstructions and easily accessible. Our plumber will handle all the necessary materials and setup.
Are the necessary pipes, fittings, and valves included in the service?
Yes, our service includes all standard pipes, fittings, and valves required to create the new washing machine inlet and drain points. Any specialized materials will be discussed if needed.
How do you ensure there are no leaks after the new points are installed?
Our plumbers conduct thorough pressure tests and visual inspections immediately after installation to guarantee all connections are secure and leak-free. Plus, your service is backed by our 30-day workmanship warranty.